How To Guide
QO
®
Outdoor Load Centers 40271-891-03
Instruction Bulletin 03/2005
Electrical equipment should be installed, operated, serviced, and
maintained only by qualified personnel. No responsibility is assumed
by Schneider Electric for any consequences arising out of the use of
this material.
© 2005 Schneider Electric USA All Rights Reserved
Schneider Electric USA
1601 Mercer Road
Lexington, KY 40511 USA
1-888-SquareD (1-888-778-2733)
www.us.SquareD.com
3. Identify the circuit breakers on the directory
label.
4. Install the trim using the three screws provided.
For QO load centers, 150–225 A, single-phase,
main lug devices rated for 22,000 RMS
symmetrical amperes short circuit systems, use
four screws by removing the interior trim support
bracket knockout.
ENERGIZING THE LOAD CENTER
1. Before energizing the load center, turn OFF (O)
the main and all branch circuit breakers.
2. After power is turned ON to the load center, first
turn ON the main circuit breaker (if installed) and
then turn ON the branch circuit breakers.
3. Rotate the door latch counterclockwise to allow
engagement through the door slot.
4. Close the door until secured by the latch.
Directory label
Figure 7: Label Locations on
Load Center Cover
French
label
Door
latch
11003018
ENGLISH