Instructions / Assembly

METER–PAK™ Wireway 73298-753-01
Safety Precautions 12/01
Square D Company
1601 Mercer Road
Lexington, KY 40511 USA
1-888-SquareD (1-888-778-2733)
www.SquareD.com
© 2001 Schneider Electric All Rights Reserved
2
Electrical equipment should be serviced only by qualified personnel. No responsibility is assumed
by Schneider Electric for any consequences arising out of the use of this material. This document
is not intended as an instruction manual for untrained persons.
E
N
G
L
I
S
H
SAFETY PRECAUTIONS
Before mounting the wireway, mount the MP METER–PAK meter center to
meet the utility minimum and maximum meter height measurements.
To mount the wireway to the meter center, see Figure 2.
Figure 2: METER–PAK Wireway Installation
HAZARD OF ELECTRIC SHOCK, BURN, OR EXPLOSION
This kit must be installed and serviced only by qualified electrical personnel.
Turn off all power supplying the equipment where this kit will be installed
before working on or inside the equipment.
Always use a properly rated voltage sensing device to confirm that all
power is off.
Replace all devices, doors, and covers after installing this kit and before
turning on power to the equipment.
Failure to follow these instructions will result in death or serious injury.
DANGER
MOUNTING WIREWAY
METER–PAK
Torque to 75 lb-in (9 N•m), four places)
4141-9621