Install Instructions
Table Of Contents
- Table of Contents
- Safety Information
- About the Book
- Before You Begin
- Steps for Setting Up
- Upstream Protective Device
- Technical Data
- Installation
- Drive mounting generalities
- Specific recommendations for mounting in an enclosure
- Position of the charging LED
- Opening the drive to access terminals
- Wiring recommendations
- Power terminals
- Control terminals and switches
- Installing option card
- Use on an impedance grounded (IT) system
- Electromagnetic compatibility (EMC)
- Checking the Installation
- Recommended branch circuit protection devices
- Maintenance
- Migration ATV21 --> ATV212
S1A53832 03/2019 79
Terminal and switches arrangement comparison
ATV21 former cards ATV212 new cards
Standard I/O card Standard Modbus/BACnet/Metasys N2/APOGEE FLNP1
card
BACnet / Metasys N2 / APOGEE option card
L
ONWORKS option card LONWORKS option card
PLC
RES
RC
FMRF
RY
PP
FLCFLBFLA
CC
P24
VIA CCVIB
ATV21
PLC
Source
Sink
FM VIA
I
V
I
V
SW4
SW2 SW3
RJ45
O
p
Sta
FLC
PLC CC
RYA RYCFLB
P24
FLA
VIA VIB CCPP
RES FM
R
F
RS485
B
A
GND SCR
Sink PLC Source I U Term
FM
VIB
VIA
U
I
PTCU
ATV212
SW102 SW101 SW103
SW100
RJ45
RJ45 factory setting:
on ATV21, to connect Modbus
on ATV212, to connect graphic display option.
For ATV212, use the open style connector to
connect the drive to Modbus, BACnet, APOGEE
FLNP1 and Metasys N2 fieldbuses.
Using RJ45 to connect Modbus fieldbus is still
possible but requires to modify parameter F807
O
p
Standard including ModBus / BACnet
/ Metasys N2 / APOGEE FLNP1
FLCFLBFLA
CC
ATV21
R
FVIBP24
A
GND SCR
B
Source
Sink
VIB
PTC
Term
SW2
SW4
RJ45
O
p
BA
CC
ATV21
L
ON
W
ORKS
VW3A21312
R
FVIBP24
SHLD
NETB
NETA
G/E FLA FLB FLC
Source
Sink
VIB
PTC
Reset
SW1
RJ45
P24MF
FLBFLA FLCG/E
RJ45
RRES
VIB PPCC
L
ONWORKS VW3A21212
Sink Source
PTCVIB
Reset
ATV212
NETA
SHLD
NETB
SW 100