Install Instructions
Table Of Contents
- Table of Contents
- Safety Information
- About the Book
- Before You Begin
- Steps for Setting Up
- Upstream Protective Device
- Technical Data
- Installation
- Drive mounting generalities
- Specific recommendations for mounting in an enclosure
- Position of the charging LED
- Opening the drive to access terminals
- Wiring recommendations
- Power terminals
- Control terminals and switches
- Installing option card
- Use on an impedance grounded (IT) system
- Electromagnetic compatibility (EMC)
- Checking the Installation
- Recommended branch circuit protection devices
- Maintenance
- Migration ATV21 --> ATV212
S1A53832 03/2019 63
Installing option card
Example for installing the LONWORKS communication card in ATV212.
Note: To install or remove the terminal board, make it slide in or out in parallel with board.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH
Read and understand the instructions in "before you begin" chapter, before performing the procedure in this
section.
Failure to follow these instructions will result in death or serious injury.
DANGER
UNINTENDED EQUIPMENT OPERATION
Do not plug or unplug the terminal board while drive is powered.
Check the tightening of the mounting screw after any manipulation on the terminal board.
Failure to follow these instructions will result in death or serious injury.
1 Open the ATV212 front cover,
remove the terminal board
mounting screw and take off the
ATV212 standard terminal board.
See paragraph How to open the
front cover, page 50
. Be careful
not to lose the terminal board
mounting screw when removed
since it may be used again. On
drives from 0.75 to 2.2 kW the
board features a plastic tag to
hold the mounting screw in place.
2 Attach the insulating sheet in
ATV212. Fix to the terminal
board mounting screw hole and
ATV212 catch pin (a).
3 Install the L
ONWORKS
communication card over the
insulating sheet. Fit the board
mounting screw (M3 tapping
type) and tighten to 0.7 to
0.8 Nm.
4 Make the power and control
wiring connections. For size 1
products (see page 14), connect
power terminals before step 3.
5 Stick the cabling label for
communication card on the
standard cabling label stuck on
front cover (internal side)
ATV212. And stick the
communication card nameplate
close to the standard nameplate.
Be careful not to cover slits on
the ATV212 enclosure.
B
A
GND
SCR
PLC
VIA
U
VIB
U
I
PT
C
SW100
Sin
k
PL
C
S
ou
rce
SW102
I
U
SW1
01
T
e
r
m
SW103
P
L
C
V
IA
U
V
IB
U
I
P
T
C
S
W
1
0
0
S
in
k
P
LC
S
o
ur
ce
S
W
1
0
2
I
U
S
W
1
0
1
T
e
r
m
S
W
1
0
3
P24M
NETA SHLD NETB
G/E
ON ORKS
R
L
W
S1A58023
VIB
Sink
PTC
Source
SW100 SW200
VW3A21212
SERVICE LED
SERVICE SW
(