Full Product Manual
5
Branch circuit
breakers: EZM
utilizes Square D
QO, Q2, LAL
circuit breakers
5 Easy Steps
1. Draw guidelines
and fasten
mounting channel
to the wall. Since
the mounting
channel
is packed
externally,
the
trims do not have
to be removed
before mounting.
2. Hang device on
channel and
position devices
together.
Swingable exter-
nal mounting
brackets quickly
and permanently
attach to the wall.
3. Remove device
trims and bolt
enclosures together.
4. Tighten
VISI-TITE
®
Nuts
until outer head
twists off.
5. Wire meter
center and
install trims.
Individual meter
socket covers
available in ring
or ringless styles
Meter socket
with front
removable,
spring-
reinforced,
tin-plated copper
jaws
Swing-up rain channel
in all branch devices
for ease of wiring
Smaller, lightweight
enclosures require less
wall space
Powdercoat paint over
galvannealed steel for
long-lasting and durable
finish
9" meter socket
centers mean
greater utility
acceptance