Installation Manual
© 2006 Schneider Electric USA All Rights Reserved
31169-601-01 Square D
®
Intelligent Load Center
10/2006 Branch Circuit Breaker Installation and Removal
5
ENGLISH
4. Remove the wire insulation from the branch wire as required. Install
the branch wire into the load terminal of the branch circuit breaker.
5. Torque each branch circuit breaker connection to the value specified
on the circuit breaker.
6. Torque each neutral and ground connection to the value specified on
the load center enclosure label.
Removal
1. Turn OFF (O) the circuit breaker. Remove the wires.
2. To disconnect the plug-on jaw from the connector and mounting rail,
pull the circuit breaker outward until it disengages from the mounting
rail. See “Removal” in Figure 4.
Tandem Branch Circuit Breakers
Installation
Install QOT tandem-type circuit breakers only in single-phase load
centers marked for use with tandem circuit breakers. Refer to the wiring
diagram on the load center for the installation location.
1. Determine the wiring or conduit requirements for the branch circuit.
2. Turn OFF (O) the circuit breaker.
3. Hold the tandem circuit breaker at 30°–45° angle.
Figure 4: QO
®
Branch Circuit Breakers
Installation
Plug-on
jaw
Mounting
rail
Wire
terminal
end
Bus bar
connector
Removal
Plug-on
jaw
Mounting
rail
Wire
terminal
end
Bus bar
connector
ENGLISH










