Use and Care Manual
Fig.C
5
INSTALLATION INSTRUCTIONS
Side and rear of unit needs to be clear of obstacles
to allow airflow through condenser. The rear of the unit
must be outdoors, not inside a building or garage.
PREPARE THE WINDOW
1
2
PREPARE AIR
CONDITIONER
A: Remove the air conditioner from
packaging and
place on
a flat surface.
B:
Remove top
rail and R1 hardware from
packaging
material as shown in
Fig.
A.
NOTE: Top rail hardware and installation is only
applicable to models WA-60FMS1 and WA-80FMS1.
Top Rail Hardware
3/8 Screws
(4)
Top Rail
(1)
Packaging
Fig.A
Top Rail
C: Align screw openings on the top rail to those on
the top of the unit. Fig.B
D: Secure top rail to the unit with the 3/8" Screws.
Fig.C.
NOTE: For safety reasons, all four(4) screws MUST
be securely fastened.
NOTE: The top rail must be assembled before
installing the unit.
3
INSTALL THE ACCORDION PANELS
NOTE: Top rail and
side p
anels at each side are offset
to provide the proper pitch to the rear of (5/16
"
).This is
necessary for proper condensed water
utilization and
drainage. If
the side panels are not used, this pitch still
needs to be maintained.
A.Place unit on floor
o
r
sturdy
table. Hold the
a
ccordion
side
panel in
one hand and gently
pull back the center to free the
open end. See Fig.1
Fig.1
Fig.B
R1 hardware
(2)
R1 hardware(for
>
)
10000Btu/h models
only
R1 hardware
(for <
)
10000
Btu/h models
only
3/4 (or 1/ )
Screws
(7)
2
Lock Frame
(2)
Sash Lock
(1)
Mounting Hardware
Foam
window seal
(1)
W
ea
th
er
st
ri
pp
in
g
(5)
(1
0
*
3/
4 *
1/
12
)










