THRUSTREAM RANGE HORIZONTAL SPLIT CASE PUMPS OPERATORS INSTRUCTIONS THRUSTREAM EXTENDED RANGE Horizontal Split Case Centrifugal Pumps And Pump Sets SPP Pumps Limited Crucible Close Mushet Industrial Park Coleford, Glos ENGLAND RG31 7SP Telephone: +44 (0)1594 832 701 Fax: +44 (0)1594 836 300 Document No: W12-005E Revision No: 3 Revision Note No: R 39552 Date Issued: August 2012 Produced at SPP Pumps Limited Coleford England
DECLARATION OF CONFORMITY We SPP Pumps Limited Of Crucible Close Mushet Industrial Park Coleford Gloucestershire England GL16 8PS Declare that: HORIZONTAL SPLIT CASE CENTRIFUGAL PUMP Equipment: Model/Type: Serial Number: Models TL to TV (As per the table on page 3) As shown on the Pump Nameplate For pumps supplied with electric motors: in accordance with the following Directives: 2006/42/EC 2006/95/EC The Machinery Directive and its amending directives Low Voltage Directive have been designed a
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 The pump sizes covered by this manual are: CONTENTS Section Page Extended Single Stage Thrustream Range: 1. General Information & Safety Instructions 4 2. Transport Handling and Storage 4 Size 3. General Description 5 200/58 TR20A 1E 4. Assembly and Installation 6 300/34 TL30A 1E 5. Commissioning and Operation 8 6.
Manual No/Rev W12-005E / 3 1. Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps General Information and Safety Instructions The products supplied by SPP Pumps Ltd. have been designed with safety in mind. Where hazards cannot be eliminated, the risk has been minimised by the use of guards and other design features. Some hazards cannot be guarded against and the instructions below MUST BE COMPLIED WITH for safe operation.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps The use of suitable forklift truck and four-chain crane sling equipment is recommended but locally approved equipment of suitable rating maybe used. Manual No/Rev W12-005E / 3 When pumps are not in use, the pump shaft should be rotated several turns, every six weeks. 2.3.2 Long Term Storage Pumps are usually supplied on pallets for handling by forklift truck, to lift from the pallet the pump should be slung as shown.
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps The standard pump is soft packed but the option to fit internal component mechanical seals or selected external cartridge mechanical seals is provided to suit customer’s requirements. These pumps are normally supplied with a cast iron casing and impeller but bronze may be supplied where required. Other parts may be supplied in a variety of materials to suit the pump application.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Remove packaging but leave the flange covers in place, check that impeller rotates freely by hand by turning the shaft. into the pump. A screen or basket strainer may also be required to hold back larger items. These should be sized to maintain the flow through them to below 0.6 m/s. If the pump has been in storage, remove any protective coatings.
Manual No/Rev W12-005E / 3 4.9 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps faces. These should be checked for cleanliness before assembly and before resorting to using shims under the motor feet. Coupling Alignment To minimise the bearing loading and to achieve full coupling and bearing life, it is recommended that the shafts are aligned as accurately as possible i.e. well below the allowable misalignment of the coupling.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Disconnect the pump drive by removal of the spacer from the coupling. Connect the electrical supply to the pump unit. Momentarily switch on motor and check direction of rotation. This should match the direction of rotation of the pump. For three phase electric motors, if the direction of rotation is incorrect, disconnect the supply and change over two of the three supply phases. Replace the coupling spacer. 5.2 5.
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps c) Suction Gauge Reading: If this is lower than normal, investigate and check that valves in the suction pipework are fully open or that the suction lift may have increased. d) Discharge Gauge Reading: If this is lower than normal, check for a leak in the associated pipework or that a valve in the delivery line has been opened when normally it is partially closed. 5.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 6.1 46 Preparation for Maintenance Manual No/Rev W12-005E / 3 51 Electric Shock & Accidental Starting Hazard ISOLATE the equipment before any maintenance work is done. Switch off the mains supply, remove fuses, apply lock-outs where applicable and affix suitable isolation warning signs to prevent inadvertent re-connection. During maintenance personnel should be aware of the risks of inhaling dangerous fumes or vapours.
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 45 by cutting off lubrication to the packing, and the packing will burn and damage the sleeve. o 6.3 9 Generally no maintenance is required on mechanical seals. They should be replaced if leakage occurs but if maintenance is required, the manufacturer's information is given in Appendix IIl. Cut each ring from the spiral at an angle of 45° diagonally across the guidelines.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps bearing can cause severe damage. The work area and all tools used for bearing replacement must be clean and free of dust and grit to prevent contamination of a clean bearing and new grease. Ball bearings should not be dismantled.
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps and lift the tab of the lock washer. the mechanical seal (52). 7. Fit the bearing housing as per the drive end bearing replacement procedure, paragraphs 17 to 20. 3 Remove the screws (62A) that retain the bearing housings (62) to the top half casing (A1). 8. Refit the cover plate (62Y).
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps (75F) and remove the bearing locknut (75) and the lock washer. Removal of the Rotating Assembly Procedure 1. 2. Remove the remaining screws (62A) that retain the bearing housings (62) to the bottom half casing (B1). Manual No/Rev W12-005E / 3 6. Using a suitable bearing puller on the inner race of each bearing, pull the bearings (66 & 67) off the shaft.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 3. DO NOT BEARING. OVERSPIN A CLEAN DRY approved coating for pumps used for potable water. 4. Inspect the bearings for wear, fractures, cracks, corrosion or other damage to the running surfaces, which may necessitate replacement. 15. Clean all threads with kerosene followed by wire brushing, dry and wrap shaft threads with protective adhesive tape. 5.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 2 3 4 Manual No/Rev W12-005E / 3 Where the location was not marked, please refer to the pump section drawing supplied or to SPP Pumps Ltd for dimensions A or B. 15. Slide the heated bearings onto the shaft to abut the shoulder. Ensure that the bearings sit fully and squarely against the shoulder. Screw the locked impeller nut (B21) or sleeve (A47) onto the shaft (71) to the marked position.
Manual No/Rev W12-005E / 3 3 8 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 6 Note Light tapping with a soft faced mallet may be needed to free the impeller from the shaft, do not damage the impeller if it is to be reused. 2 12 10 1. Using suitable pullers or levers, slide the first impeller (A21) of the shaft (71). 9 11 2. Withdraw the interstage plate (8) from the impeller spacer (17) and check the condition of the interstage neck bush (24) replace if worn.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 7. Faults and Remedial Action POTENTIAL FAULT OR DEFECT: No liquid delivered. Insufficient liquid delivered. Liquid delivered at low pressure. Loss of liquid after starting. Excessive vibration. Motor runs hotter than normal. Excessive noise from pump cavitation. PROBABLE CAUSES Pump not primed.
Manual No/Rev W12-005E / 3 8. 8.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 8.2 Note: Manual No/Rev W12-005E / 3 Single Stage Pump Parts Identification List - (Numbers as shown on cross section drawing) Pump construction may vary slightly between the different pump sizes within each type, it is important to refer to the specific pump section drawing and to quote the pump serial number when ordering parts to ensure that the correct part is supplied in the original material of construction.
Manual No/Rev W12-005E / 3 8.3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Pump Cross Section Drawing –Two Stage Pump – Clockwise Rotation.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 8.4 Two Stage Pump Parts Identification List - (Numbers as shown on cross section drawing) Note: Pump construction may vary slightly between the different pump sizes within each type, it is important to refer to the specific pump section drawing and to quote the pump serial number when ordering parts to ensure that the correct part is supplied in the original material of construction.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 9. Standard Metric Nut and Bolt Torque Recommendations This information is for reference only. The user must check that the torque figures listed here are applicable to the fasteners used. Nuts and bolts should be neither under nor over tightened. Grade of Bolt Approximate Torque (Nm) for Bolt Diameters: M8 M10 M12 M16 M20 M24 11 22 38 95 185 320 4.6 M5 2.7 M6 4.5 M30 633 M36 1110 8.8 6.9 11.
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 Installation & Maintenance Record Date Summary of maintenance & repairs done - replacement parts fitted etc: Initial Alignment TIR readings: First Lateral Check: …………… Angular Check: ………….. Confirmed Lateral Check: ………….. Final Alignment TIR readings: First Lateral Check: …………… Angular Check: ………….. Confirmed Lateral Check: …………..
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Our policy is one of continuous improvement and we reserve the right to alter specifications at any time Page 26 of 28
Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps Manual No/Rev W12-005E / 3 Our policy is one of continuous improvement and we reserve the right to alter specifications at any time Page 27 of 28
Manual No/Rev W12-005E / 3 Operators Instructions for Horizontal Extended Thrustream Centrifugal Pumps 10. SPARES & SERVICE SPP Pumps operate a comprehensive Spares and Service support network throughout the world, and can be contacted as follows: SPARES & SERVICE Telephone: For spare parts, supply only. ask for - +44 (0)1189 323 123 For breakdowns, spare parts and on-site fitting, pump installation and commissioning, and service contracts. ask for For breakdowns outside office hours.