PUMP INSTALLATION GUIDE GUIDE TO THE INSTALLATION OF SPP PUMPS SPP Pumps Limited. Crucible Close Mushet Industrial Park Coleford Gloucestershire GL16 8PS Telephone: + 44 (0)1594 832 701 Fax: + 44 (0)1594 836 300 Document No: W00-002E Revision No: .................. 4 Revision Note No: Windchill Date Issued.
Manual No/Rev W00-002E / 4 Pump Installation Guide General Safety Instructions The products supplied by SPP Pumps Limited have been designed with safety in mind. Where hazards cannot be eliminated, the risk has been minimised by the use of guards and other design features. Some hazards cannot be guarded against and the instructions below MUST BE COMPLIED WITH for safe operation. These instructions cannot cover all circumstances, YOU are responsible for using safe working practices at all times.
Pump Installation Guide Manual No/Rev W00-002E / 4 1.3.3 Abrasion and Entrapment CONTENTS 1 Section Page Pump Hazards .......................................... 3 2 Introduction ............................................... 5 3 Installation................................................. 5 4 Connection to Services ............................. 9 5 Commissioning ....................................... 10 6 Grouting ..................................................
Manual No/Rev W00-002E / 4 Pump Installation Guide 1.3.9 Gases, Mists, Sprays and Leaks Be aware of the hazards relating to the pumped fluid, especially the danger from inhalation of noxious and toxic gases, skin and eye contact or penetration. Obtain and understand the hazardous substance (COSHH) data sheets relating to the pumped fluid and note the recommended emergency and first aid procedures. Do NOT place tools on or near the Batteries such that a short circuit may be caused.
Pump Installation Guide 2 re-circulation, must be provided in the pump house structure. Introduction This manual specifies SPP Pumps Limited requirements for the installation of SPP horizontal and vertical split case and end suction pumpsets. 3.2 SPP Pumps Limited requires that this document is given to all contractors with responsibility for site preparation, electrical supply and connection, pump installation and pipework etc.
Manual No/Rev W00-002E / 4 Pump Installation Guide Signed Plinth Sized and Made to Specifications. CHANNEL SECTION BASE FRAME Date FOUNDATION BOLT 3.3 Foundation Bolts FLAT WASHER Two types of foundation bolts are normally used; either rag bolts set into pre cast pockets in the plinth or, chemical anchor bolts for which pockets are drilled into the plinth after casting.
Manual No/Rev W00-002E / 4 Pump Installation Guide 3.5 3.7 Slide Rail Mounting Installing the Pumpset It is important to install ATTENTION pumpsets BEFORE installing the main suction and delivery pipework. This is to ensure that the pipes are positioned to match the pump location and do not transmit load and induce strain in the pump casing. For long coupled pumpsets, remove the coupling guard to provide access to the shaft and coupling.
Manual No/Rev W00-002E / 4 Pump Installation Guide mount the pumpset, mark the foundation bolt positions and lift off the pumpset to give access for drilling. Hang the anchor bolts in their holes and lower the pumpset in position having inserted the anchors into their fixing holes. Note Poor alignment is a major factor contributing to shortening of pump bearing and seal life. It is recommended that alignment is checked frequently and maintained at below 10% of the manufacturer’s specified figure.
Manual No/Rev W00-002E / 4 Pump Installation Guide beyond the piping supports closest to the pump. INCREASER CHECK VALVE DISCHARGE VALVE not recommended, however if unavoidable there should be a distance of at least 5 pipe diameters between the valve and the pump inlet flange. DISCHARGE PIPE The suction pipe should be as short and direct as possible, and should be flushed clean before connecting to the pump. Where suction lift is not very high, it is advisable to use a foot valve.
Manual No/Rev W00-002E / 4 Pump Installation Guide before the engineer arrives. It is SPP Pumps Limited policy that service engineers will give as much assistance as possible to the customer in solving site problems. However, if due to incomplete installation or failure of equipment not supplied by SPP Pumps Limited, further visits are required to complete commissioning then, additional charge will be made.
Manual No/Rev W00-002E / 4 Pump Installation Guide SPP Pumps Limited operate a comprehensive Spares and Service support network throughout the world, and can be contacted as follows: SPARES & SERVICE Telephone: ask for - Spares For spare parts, supply only. For breakdowns, spare parts and, on-site fitting, pump installation and, commissioning, and service contracts. For breakdowns outside office hours.