User Manual
Table Of Contents
INSTALLATION
SpotCell
®
2500Xe 17
4. Hold the CU in the position it is to be mounted. Ideally the display on the back of the
CU will show 5 bars for coverage area.
Figure 2.10: Coverage display on CU
If it is not showing 5 bars for coverage area and there are alternate mounting
locations, move the CU to the alternate locations and check the display. Place the
CU in the location showing maximum number of bars.
See CU indicators on page 33 for more information on the CU Coverage Indicator.
5. If the number of bars is not changing, which is very possible, choose a CU mounting
location that is convenient for the area requiring coverage.
6. Once the CU is positioned for optimal coverage, permanently run the copper core
coaxial cable from the DU to the CU locatrion. See Routing the cable and Bringing
the cable indoors on page 22.
7. Tighten the cable connection to the CU with a wrench (a 1/4 of a turn tighter than
finger tight) to ensure moisture does not penetrate.
8. Refer to Mounting the CU on page 25 for mounting instructions.