User's Manual
Table Of Contents
I
NSTALLATION
10
SpotCell 100, Release 1.0
Note: For inside installation it is recommended that various locations
within the structure be tested as suitable locations to position the DDU.
For each location the DDU is tested and the LED is green, the display
on the bottom of the SCU indicates the relative signal strength the
DDU is receiving (see figure below). Mount the DDU in the location
that has the highest indicated signal level.
Figure 3.4:Displayed Signal Strength
9.
Proceed to page # for mounting instructions once the DDU
location has been optimized.
TO BE UPDATED