Installation Manual
Z® SERIES
SpeedTech Lights, Inc © 2018
Mounting Static Brackets:
• This bracket can work with Deck and Dash as well as Grille products.
• For Grille products, run the cable through the central hole. Use the
hardware included with the Grille product to mount the unit to the
bracket in the oval tracks.
• For Deck and Dash products, position the slide track screws included
with the Deck and Dash product such that the screws line up with
the oval tracks. Use the included nuts and washers to attach bracket
to unit.
Mounting Z® Flange Bracket:
• Push the Z® model into the bracket up through the rear.
• Use the hardware included with your Z® product to mount the unit
to the Flange.
• Use the hardware included with the Flange to secure the Flange to
the vehicle.
How to Alternate Sync the Z® Series Together
• Divide the Z® products into two Groups.
• Take all the Red cables from Group 1 and tie them together.
• Take all the Black cables from Group 1 and tie them together.
• Take all the Yellow cables from Group 1 and tie them together.
• Take all the White cables from Group 1 and tie them together.
• Take all the Blue cables from Group 1 and tie them together.
• Connect the Red cables to Power.
• Connect the Black cables to Ground.
• Group 1 is ready for syncing.
• Follow all same procedures for Group 2 as with Group 1.
• Now that both Groups are ready for syncing, take all the Blue cables from Group 1 and hold them to +12VDC for 3 seconds. Half of all units
in Group 1 will light up steady burn.
• Quickly take all the Blue cables from Group 2 and hold them to +12VDC for 5 seconds. You will notice half of all units in Group 2 will light up
steady burn after 3 seconds. Continue to hold it for a total of 5 seconds and you will notice the opposite half of the units will light up steady
burn.
• Once you have programmed both Groups such that Group 1 and Group 2 are all steady burn on opposite sides of each other, disconnect
+12VDC and quickly reconnect +12VDC. NOTE: This step must be done quickly. If any of the Groups go o steady burn and no longer
light up, this step must be repeated. Group 1 and Group 2 units must be half steady burn when you disconnect +12VDC or else
proramming will be incomplete.
• Programming is complete and Group 1 will Single Flash alternatively with Group 2.