Installation Guide
position thus fastening the hanger arms into place, repeat for all hanger arm
feet. (See Figure).
Task 5: Wall Installation
The wall installation taks are similar to ceiling installations other than wall
stack units may be necessary to conceal the Speedi-Boot unit inside the wall
stud cavity.
Task 6: Ductwork Connection-Speedi-Boot
Extend the flex duct or sheet metal round pipe to the Speedi-Boot location
for connection. For sheet metal connections use sheet metal self tapping or
piercing screws and approved foil tape for each fitting connection & insulate
according to local building codes. For flex duct connections roll or push back
the outer liner and fiberglass insulation to expose the coiled wire inner core
and slide the inner core over the Speedi-Boot collar, (See Figure).










