Installation Guide

8.Secure The Overhead Track
Swing the track back to its original
th a nail or a 3/32” drill), drive the 3/4”
track screws through all track holes. Set
all screws as straight and tight as
possible to assure smooth operation
of the door.
9. Secure The Anchor Panel
Align the Anchor Panel on the non-opening
side of the door jamb. Make sure the panel
is straight up and down.
10. Install The Magnetic Latch
Striker Plate
Position the striker plate on the
closure channel, across from the
magnet on the lead edge of the door.
Mark the location of the striker plate
holes on the channel. Make
pilot-holes (with a nail or a 3/32” drill)
in the closure channel. Install the
striker plate with two 1”
athead screws.
Double Door Installation
For openings wider than 36” and less than 72”, two doors may be
used in pairs
1.Measure The Door Opening
Divide the width of the opening by two. Cut each overhead track to this
measurement so that when installed, the tracks butt against one another in
the center of the door opening.
2. Install The Overhead Track
On a center line drawn across the top of the door opening, install either half
track and install all screws in the half track.
3. Install The Door Panels
Please lubricate the top glides with the lubricant supplied. Install the two
doors in the rst track with lead edges facing each other. Then install the
second track and push one door onto this track. Set a screw at the track
center joint and leave the screw projecting down 1/2” to prevent glides from
passing the joint.
4. Install The Magnetic Latch Striker Plate to
Closure Channel
Follow single door installation step number 10.
ANY QUESTIONS?
Feel free to call us at
(570) 385-5470 or 1-800-360-1585
Monday-Friday, or visit our web site “www.ltlhomeproducts.com”
© 2015 LTL Home Products, Inc.
7. Install the Door Panels
Apply track lubricant to each top-glide. Swing one end of the overhead track
out of the door opening to accept the top-glides. Decide if you want the
door to open from the left or the right, then slide all top-glides onto the track.
Stack the panels together near the center screw.