Reference Manual Owner manual
Stakeout Menu 
R-295 
Point Slope Staking 
Stakeout   Point Slope Staking. 
The Point Slope Staking routine is a simplified version of the Slope 
Staking routine described on Page R-288. 
The Point Slope Staking
 routine determines the location of the catch 
point from a known hinge point and a specified horizontal direction 
from the hinge point, whereas the Slope Staking
 routine determines 
the location of the catch point from a perpendicular offset to a known 
centerline at a specified station. 
The first screen is used to specify the hinge point and 
horizontal direction from the hinge point to the catch 
point. 
 From Point : is the hinge point. 
Point  / Direction : is either another point that lies in 
the same vertical plane as the hinge point and catch 
point, or the azimuth from the hinge point to the catch 
point, respectively. 
Fill Slope: is the desired slope, calculated from run over 
rise, between the hinge point and catch point when the 
area requires a fill. 
Cut Slope: is the desired slope, calculated from run over 
rise, between the hinge point and catch point when the 
area requires a cut. 
Height of Rod: is the rod height. 
 Backsight… : accesses the Backsight Setup screen. 
 Stake CP > : opens the next screen. 










