Reference Manual Owner manual
Survey Pro Reference Manual 
R-246 
Occupy Control Setup 
The Occupy Control Setup screen is used to specify 
which job point with accurate NEE coordinates you are 
occupying and if you want to use the point for horizontal 
and/or vertical control when localizing (this can be 
changed later). 
Point: is the existing job point you are occupying. 
H: Check this if the point has good horizontal coordinates 
to use for horizontal control when localizing. 
V: Check this if the point has a good elevation to use for 
vertical control when localizing. 
 Start Control Point Occupy : Opens the Occupy Control 
Point screen, described on Page R-251. 
Occupy Control Point 
The Occupy Control Point screen is used to add geodetic coordinates 
to an existing project point and is described on Page R-251. 
Resection for New Base Point 
 Occupy Check > : opens the Collect Check Point Prompt 
screen to select an existing job file point and initiate an 
occupation to check the localization solved with the 
minimum amount, and then create an extra GPS control 
point, which will be used to re-solve the localization and 
run the blunder detection routine. 
 Start Now > : starts surveying without checking the 
localization. In this case, the localization solved with the 
minimum control points will be set in the job file, and 
the projection readjust mechanism will run to update 
any job points as required. You must remember that the 
solution has not been checked for quality. 










