Reference Manual User Manual
Survey Pro Reference Manual
R-196
Projection : opens the Projection screen (Page R-204).
View Points : opens the View Coordinates File screen, where the
project points can be examined.
Post Process : opens the Receiver Session screen (Page R-202), where
you can occupy a point for a post processing only session. This allows
you log a session in the post processing file using an existing point
name without changing that point record in the job file.
Check : opens the Check Control Point screen, where the local
coordinate computed from the measurement is compared to the local
coordinate’s known value.
Control : opens the Occupy Control Point screen, where geodetic
coordinates are measured at a point with local coordinates and added
to that point record in the job file.
Check Control Point Screen
Survey Control Points Check Point.
or Data Collection Control Check Point.
The Check Control Point screen is used to check a control point. This
is done when you want to verify the quality of the coordinate system
solution.
Coordinates: displays the local coordinates
computed using the current measurement and
the latest projection solution.
Solution Quality: displays the quality of the
current measurement: the solution type, the
number of satellites used, and the horizontal
and vertical precision computed by the
receiver. These values are explained with the
GPS Status screen
(Page - R172)
Errors: displays the differences between the
computed local coordinates and the known
coordinates for the control point.