Installation Guide
INSTRUCTIONS FOR MODELS
92-VS-127-01
For additional assistance or service please contact:
SPEAKMAN
®
800-537-2107
customerservice@speakman.com
www.speakman.com
VS-127
HELPFUL TOOLS & SUPPLIES:
TOOLS AND SUPPLIES
Adjustable
Wrench
Thread Seal
Tape
Phillips
Screwdriver
Mounting Screws
(Included)
Safety
Glasses
Measuring
Tape
Flat Tip
Screwdriver
Drill
Nut Driver Bit
3/8”
Drill Bits Phillips
Drive Bit
Keyhole
Saw
Level
Pipe
Wrench
Warranty information can be found at:
www.speakman.com
WARRANTY
Cover your drain to prevent loss of parts. Be sure to
wear eye protection while cutting pipe.
SAFETY TIPS
IMPORTANT
• Be sure to read instructions thoroughly before
beginning installation.
• Do not over-tighten any connections or damage
may occur.
NOTE: Rain Shower Head as shown here in the
Installation Steps and the Construction Lumber is for
reference only and is not included with the product.
NOTE: The VS-127 Ceiling Mount Flange is only
intended to be used with the Speakman Rain
Shower Head S-2764.
Periodic cleaning using a mild soap and warm water will
help keep your Shower Head's appearance in its original
condition.
For best results, dry immediately with a soft, clean cloth.
DO NOT USE harsh and/or abrasive cleaners.
In certain water conditions, mineral deposits may form.
To remove these deposits, it is recommended that you
soak the shower head in a solution of 2 parts vinegar to
1 part water for one hour. Rinse thoroughly with fresh
water.
• Periodically check to ensure the seal is fully engaged
with the shower to prevent moisture leakage.
• Periodically check on mold/calcium build up on
contact areas of the seal.
MAINTENANCE
IMPORTANT
SUPPORT FRAMING1
• Use 2” x 4” to construct the support framing to mount the Rain Shower Head Flange.
• The Rain Shower Head Flange needs to be inserted into a 16” x 16” square. The face of each
Cross Beam should be installed in standard fashion, perpendicular to the face of the ceiling
joists. This frame will become part of the Drop Ceiling.
16
”
406mm
16
”
406mm
NOTE:
Length of the longer beams should be adapted to fit your application
2 OVERHEAD WATER SUPPLY CONNECTIONS
• Route a Water Supply (not supplied) to the ceiling where the shower is to be installed.
• Use Pipe Flanges to secure the Pipe as necessary.
3 DROP CEILING CONSTRUCTION
• Install a Drop Ceiling using 2” x 4” construction. The support frame constructed in STEP 1
should be part of this Drop Ceiling.
• Locate the 16” x 16” square where the Rain Shower Head is intended to be used.
• Cut out the 16” x 16” square in the Drop Ceiling drywall.
NOTE:
See Rough-In for required dimensions of the Ceiling.