Installation

92-2840-R2
12of 18
UCM (under counter mixer) with MO (manual override) Installation
1. Install the MO as described above.
2. Install the UCM fixed on the wall with the Clamp in the desired position.
3. The UCM it is marked with H and C for hot and cold supply lines. The mixed water exits on top into the Tee.
4. The water supply splits into the Tee: -one exit hose goes to Solenoid and the other hose goes to bottom of MO.
5. Form the side of MO the by-pass hose goes to the upper side of Solenoid discharge for manually controlled side
NOTE: For MO is used a Solenoid with a by-pass branch at its outlet. Use a Tee to split the supply water in 2 sides