Installation

5
Place one end of Spring Clip ❶, on Pivot Rod
❷. Insert Pivot Rod ❷ through a hole in the Lift
Rod Strap ❸. Secure with Spring Clip ❶.
6
Place Drain into the open position by pressing
downward on the Pivot Rod ❶. Insert Lift Rod ❷
into Strap ❸. Adjust height of Lift Rod ❷, and
tighten Thumb Screw ❹.
7
Additional adjustments can be made to ensure a proper seal between the Drain Stopper ❶ and Drain
Assembly. Remove Pivot Nut ❷, from Drain Assembly. Slide out Pivot Rod Assembly ❸ . Remove Drain Stopper
❶. Additional adjustments can be made by either threading in or out the eyelet portion of the Drain Stopper ❶.
S-3357 ROUGH-IN DIAGRAM
SPEAKMAN
®
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.
NOTES:
COMPLIANCE:
FEATURES:
CONNECTIONS:
ASME A112.18.1/CSA B 125.1
• Brass Construction
• Rubber Seals
For 1-¼” Drain Connections
MAXIMUM
DISTANCE