Installation Guide
INSTRUCTIONS FOR MODELS
92-CPV-TP-02
For additional assistance or service please contact:
SPEAKMAN
®
 Company
400 Anchor Mill Road
New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
CPV-TP
CPV-TP-DV
HELPFUL TOOLS & SUPPLIES:
TOOLS AND SUPPLIES
Pencil Keyhole
Saw
Adjustable
Wrench
Thread Seal
Tape
9/16”Deep Well
Socket
Socket
Wrench
Solder Kit
Phillips
Screwdriver
Measuring
Tape
Safety
Glasses
Tubing
Cutter
13/16”Deep Well
Socket
Level
Additional warranty information can be found at: 
www.speakman.com
WARRANTY
Your new Shower/Bath Valve is designed for years of 
trouble-free performance. Keep it looking new by 
cleaning it periodically with a soft cloth. The use of 
harsh chemicals and abrasives on any of the Speakman 
custom finish products may damage the finish and void 
the product warranty. Please be sure to only use 
approved cleaners. Please contact Speakman for any 
clarification of acceptable cleaners.
MAINTENANCE
Cover your drain to prevent loss of parts. Be sure to 
wear eye protection while cutting pipe.
SAFETY TIPS
IMPORTANT
• Be sure to read instructions thoroughly before 
 beginning installation.
• Be sure to have properly adjusted the Temperature 
 Limiting Stop (TLS) as outlined in this Installation 
 Manual.
• Inspect all connections after installation of valve.
• This valve has an operating range of 20-80 Psi.
• This valve is designed to be used in conjunction 
 with a shower-head rated at 1.5 gpm (5.7 L/min) 
 or higher flow rate.
• NOTE: This installation manual covers several 
 models of valves. While the appearance of your 
 valve may differ from those shown, the installation 
 method is the same.
• Maximum water pressure: 125 PSI static; minimum 
 water pressure: 20 PSI flowing; minimum cold 
 supply temperature: 40° F; maximum hot supply 
 temperature: 160° F; minimum hot supply   
 temperature: 5° F above set point.
This type of valve must be cleaned and maintained on a 
regular basis. Periodic maintenance should be 
performed at least every 12 months or after any 
changes have been made to the building’s plumbing 
system. This maintenance should include removing and 
cleaning the spring check stop components. Make sure 
the stop poppet in each stop moves freely. The Lower 
Cartridge Seal with Integral Screens (located at the base 
of the Valve Cartridge) should be removed and cleaned 
during this maintenance cycle.Valves that are installed 
outdoors should be winterized by removing all of the 
internal parts and removing any standing water from the 
valve. Quarterly the maximum hot temperature setting 
(TLS) should be checked and adjusted accordingly. 
1
Referencing the supplied rough-in dimensions
(located at the end of this manual), determine the 
preferred location of valve. Align the supplied 
rough-in template with this location and trace 
outline of template onto wall. 
1’-9” (533mm)
TO CENTERLINE
OF TUB SPOUT
(FOR TUB INSTALLATION)
4’-6” (1.4m)
TO FLOOR
(SHOWER INSTALLATION)
2
Using a keyhole saw or similar tool, cut along 
traced line and remove this section of wall.
3
Unthread and remove the Integral Stops using 
a socket wrench equipped with a 9/16” deep 
well socket.
Socket
Wrench
9/16”Deep Well
Socket
+
4
If your Shower Valve is equipped with an 
integral diverter, remove the Diverter Nut using 
a socket wrench and a 13/16” deep well 
socket. Remove Diverter Cartridge to prevent 
damage during soldering.
Socket
Wrench
+
13/16”Deep Well
Socket
5
Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in 
dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper 
depth. The distance from the centerline of the inlet/outlet ports of the valve assembly to the finished wall MUST be between 2½” - 3½”. See images below 
for reference.
SHOWER OUTLET
TUB OUTLET
ROUGH-IN TEMPLATE
THE BACK EDGE OF THE 
ROUGH-IN TEMPLATE IS 
FLUSH WITH OR INSIDE 
THE VALVE ACCESS HOLE.
FINISHED WALL SURFACE
2½” MINIMUM
MOUNTING DEPTH
MINIMUM MOUNTING DEPTH
SHOWER OUTLET
TUB OUTLET
ROUGH-IN TEMPLATE
THE FRONT SURFACE OF 
THE ROUGH-IN TEMPLATE 
IS FLUSH WITH OR OUTSIDE 
THE VALVE ACCESS HOLE.
FINISHED WALL SURFACE
3½” MAXIMUM
MOUNTING DEPTH
MAXIMUM MOUNTING DEPTH










