Instructions / Assembly
Bench assemble the Tee to the HOT and COLD
end body valves. Be sure to fully seat the copper 
piping into the end body valves, and hand 
tighten Compression Nuts to the outlet ports. 
Be sure the end body valves are perpendicular 
to the Tee assembly.
90°
 Insert and position the gooseneck flange with 
 gasket down through the center hole of the 
sink or counter top, being sure the cut out of the 
gasket is aligned to the rear of the faucet. Assemble 
Rubber Washer , Metal Channel Washer and 
Mounting Nut to shank and thread only half way 
up the shank.
Loosen the set screws and remove the end 
body valve flange nuts and rubber washers 
Screw the locknuts and cup washers 
down on end body valves.
From below the counter top, push the end body 
with tee assembly up through the outer holes in 
the sink or counter top. NOTE: Blue colored 
end body (COLD) should be on the right side 
of tee assembly, Red colored end body (HOT) 
on the left. Hand tighten the tee assembly’s 
swivel nut to the shank of the gooseneck 
flange .
BLUE
(COLD)
RED
(HOT)
While lifting the end body with tee assembly 
up by its spindles, replace the rubber washers 
and screw the flange nuts back onto the end 
body valves, with flat side up, till they are flush 
with the tops of the 1-1/8”-16 UN threads of 
the end body valves.
 NOTE: Do Not Overtighten Swivel Nut
From below, wrench tighten the gooseneck 
flange nut with channel washer/spacer , 
tee swivel nut , end body valve locknuts 
with cup washers , and two (2) tee 
compression nuts at the outlets of the end 
body valves to secure the entire unit and 
prevent leaks.
Ensure the Flange Nuts are flush with the tops 
of the 1-1/8”-16 UN threads, then tighten set 
screws .
Connect water supply lines to inlets (1/2”-14 
NPSM male threads) of the end body valves 
and wrench tighten coupling nuts to prevent 
leaks.
 NOTE: Flex Hoses and Shut Off Valves not included.