Install Manual

Span 1-00800-xx Installation Manual (rev. 2022-01-28) 10
2. Using the Panel as Service Equipment
Verify Neutral-to-Ground Bonding
When used as service equipment, ensure the factory-installed main bonding jumper is securely in place.
When not used as service equipment, remove the main bonding jumper.
Location of bonding jumper in Span Panel
WARNING: When the Span Panel is not installed as service equipment, the factory-installed main bonding jumper MUST
be removed. In this case, ensure Neutral and Ground are properly bonded at the upstream service equipment.
CAUTION: Do not modify or rewire any factory-installed connections except the main bonding jumper.
NOTE: When the Span Panel is installed as service equipment, ensure the panel’s main breaker is appropriately labeled
as “SERVICE / MAIN DISCONNECT”