Instruction Manual

brackets. Please refer to Table 1 for recommended
posioning of the heater.
2. Fix in the required angular posion by ghtening the
xing bolts on the brackets at the rear of the heater.
3. Arrange the mains supply cord so it cannot be
tripped over or damaged and ensure it is not rest-
ing on the heater body or mounng brackets. Also
ensure it is away from the front of the heater.




Triple
Quad
4.2 Chain suspension
Eclipse heaters can be chain hung from a ceiling.
When ceiling hanging the Eclipse heater, ensure
the minimum distance from the ceiling is adhered
to as shown in Fig. E. and maintain the minimum
distance to the oor.
Please refer to Table 1 for the recommended
posioning of the heater with regards to minimu
distances.
Do not install the heater in a corner!
Always allow the heater to cool before aempng
to reposion/move. Never aempt to move the
heater while it is switched on!
Observe the minimum safe distance between the
heater body and inammable surfaces and objects
when mounng.
Keep out of the reach of children.
1. Please refer to Table 1 for
recommended posioning
of the heater. When hanging
from a ceiling, two chains of
equal length and gauge are
required and should be used
with xings that are
adequate to hold the weight
of the heater. If in doubt
contact a professional for
advice!
2. Aach the heater assembly
to the chains via the hole in
the centre of the middle
bracket (remove the
L -shaped wall brackets) as
shown in Fig. E. and ensure
the heater faces directly
down when hanging.
3. Arrange the mains supply
cord so it cannot be tripped
over or damaged and ensure
it is not resng on the heater
body or mounng brackets.
Also ensure it is away from
the front of the heater.



5. Maintenance

1. Disconnect the mains electric power supply to the
heater and ensure the heater and ceramic emiers
are cool.
2. Remove the 4 × Phillips head screws from the
at end plate (opposite end to the permanently
connected mains cord), see Fig. F.
381mm 
4no Holes
Fig. B
531mm 
4no Holes
711mm 
4no Holes
Fig. C
Fig. D
Minimum clearance to ceiling or cover

Floor Level
2m

Fig. E
CAUTION
Disconnect the heater from the mains electric power supply
before any aempts are made to replace the ceramic
emier. Contact your distributor for the correct replacement
ceramic emier quong model type and rang from the
rang label.
It is important that you read through the ceramic emier
replacement procedure before commencing.