User's Manual
4
Pre-Installation
PLANNING INSTALLATION
□ Unpack your LED mirror carefully, and close the sink drain to prevent any dropped parts from falling into the drain.
□ Please read the entire manual before beginning installation and become familiarized with the steps and parts involved.
□ For surface-mount installation only.
TOOLS REQUIRED
Measuring
tape
Level
Phillips
screwdriver
Electric drill
for surface
mounting
Stud
nder
HARDWARE INCLUDED
NOTE: Hardware not shown to actual size.
BB CCAA
CAUTION: The included plastic wall anchors (AA) are
intended for use with solid wall applications only (tile
and concrete). DO NOT USE WITH DRYWALL OR OTHER
HOLLOW WALL APPLICATIONS. Refer to additional warning
information on Page 5 of this instruction manual.
Part Description Quantity
AA Plastic wall anchor 2
BB Phillips head screws (#8 X 1.5 in.) 2
CC AC/DC Adaptor 1