User Manual
Table Of Contents
- 1. UNPACKING
- 2. ACCESSORIES
- 3. OVERVIEW
- 4. MAIN FEATURES
- 5. REAR PANEL CONTROLS
- 6. INSTALLATION
- 7. LED DISPLAY AND BUTTONS OPERATION
- 8. IR REMOTE CONTROL
- 9. DIMMER CURVES
- 10. DMX512 CHANNEL CHART (12CH)
- 11. SPECIFICATIONS
- 12. WARRANTY AND SERVICE
- 13. WARNING
- 14. DISIMBALLAGGIO
- 15. ACCESSORI
- 16. PANORAMICA
- 17. CARATTERISTICHE
- 18. CONTROLLI DEL PANNELLO POSTERIORE
- 19. INSTALLAZIONE
- 20. FUNZIONI DEL DISPLAY E DEI CONTROLLI
- 21. IR CONTROLLO REMOTO
- 22. CURVE DIMMER
- 23. TABELLA DEI CANALI DMX512 (12CH)
- 24. SPECIFICHE
- 25. GARANZIA ED ASSISTENZA
- 26. AVVISO
2. Buttons: The four buttons allow the user to navigate all menus and change value
to all functions. Please refer to “7. LED DISPLAY AND BUTTONS OPERATION” at
page 10 for further information.
3. DMX Signal output: It transfers DMX signal to next xture. Please use 3pin XLR
signal cable.
4. DMX signal input: It receives DMX signal from another xture. Please use 3pin
XLR signal cable.
5. Power PLUG: This is a grounding-type plug with two poles and a third grounding
terminal. The third prong is provided for your safety. If the provided plug does not
t into your outlet, refer to an electrician for replacement.
6. INSTALLATION
6.1. Rigging and Clamps
Pay attention to the safety! Please respectively consider the EN 60598-2-17
and the national standard during the installation. The authorized dealer must
only carry out the installation.
The installation of the xture has to be built and constructed in a way that it can hold
10 times the weight for 1 hour without any harming demolish. The installation must al-
ways be secured with a secondary safety attachment, e.g. an appropriate catch net. This
secondary safety attachment must be constructed in a way that no part of the installa-
tion can fall down if the main attachment fails.
When rigging, de-rigging or servicing the xture staying in the area below the instal-
lation place, on bridges, under high working places and other endangered areas is
forbidden. The operator has to make sure that the safety measure and the machine’s
technical installation is approved by an expert before taking into operation for the rst
time and after changes before taking into operation anther time. He has also to make
sure that an expert approves safety measure and the machine’s technical installation
once a years.
WARNING:Thextureshouldbeinstalledoutsideareaswherepersonsmay
walk by or be seated.
IMPORTANT:Overheadriggingrequiresextensiveexperience,including(but
not limited to) calculating working load limits, installation material being
used, and periodic safety inspection of all installation material and the pro-
jector.Ifyoulackthesequalications,donotattempttheinstallationyour-
self, but instead use a professional structural rigger. Improper installation can
result in bodily injury or property loss.
If the xture shall be lowered from the ceiling or high joists, professional trussing
8
ENGLISH
WF-U11 User manual










