Instruction Manual

Form 1306 (04.13) ©SOR Inc.
3/4
REMOTE MANUAL CHECK
MD OPTION
Installation
The unit may be mounted using the standard 2” NPT process connection.
MD Remote Option (includes plunger, 20 foot cable and two crimps.)
Screw plunger to the top of unit.
Thread the 20’ cable through the hole in plunger and create a 14 inch top loop as
shown below.
At the bottom of the cable, a second loop can be created as a handle for actuation at
the desired length.
Linear = mm/inches
Drawing 0098626 p.2
CRIMP
REMOTE CABLE
CREATE HANDLE AT DESIRED LENGTH
TOP 14” LOOP
PLUNGER
REMOTE MANUAL CHECK
MD OPTION