Installation Sheet

March 09, 2016
©2016 SONNEMAN - A Way of Light
12 of 29
A
F
Suspenders™ - Double Ring Conguration
Assembly Instructions
INSTRUCTIONS D’INSTALLATION
Important
Always disconnect the power before installing or replacing bulbs and before cleaning or other maintenance.
Consult a qualied, licensed electrician to ensure correct branch circuit conductor.
Consulter un électricien qualié pour vous assurer que les conducteurs de la dérivation sont adéquats.
Note
This fixture is dimmable with Electronic Low Voltage (i.e., Trailing-Edge/Reverse Phase) type dimmers ONLY.
C
E
G
D
B
H
1. Shut off power to the outlet box.
2. Assemble the Power Feed (A) as shown on page 17.
3. Determine desired hanging height, and cut the support cables (B) to length plus 3 inches. Connect the inner Ring Power
Bar (C) to the Power Feed (A) by inserting the support cables into the grippers (D) and adjusting to the desired length: to
shorten, push the cable up; to lengthen, push in the gripper plunger while pulling down on the cable, release the plunger to
lock. Connect the inner Ring Cord Power Feed Hangers (E) to the Power Feed (A) as shown on page 25.
Note: The inner Ring Power Bar cables and cords should connect to the inner set of Power Feed bushings and grippers.
4. Repeat Step 3 for the Outer Ring Power Bar (F).
Note: The outer Ring Power Bar cables and cords should connect to the outer set of Power Feed bushings and grippers.
5. Connect the Luminaire Hangers (G) to the Ring Power Bars (C, F) as shown on page 29. (Fig. 3)
Suggested Installation:
24"/40" - Hang 15pcs Luminaire Hangers (G) on outer Ring Power Bar (F), 9pcs Luminire Hangers (G) on inner Ring Power Bar (C).
32"/48" -
Hang 18pcs Luminaire Hangers (G) on outer Ring Power Bar (F), 12pcs Luminire Hangers (G) on inner Ring Power Bar (C).
6. Connect the Luminaires (H) to the Luminaire Hangers (G) as shown on page 29. (Figs. 1-2)
7. Restore power to the outlet box.