Installation Sheet

December 16, 2019
©2019 SONNEMAN - A Way of Light
12 of 13
Step 10
a. Connect the Power Feed Hub cluster as seen in Fig. 21, making sure not to tangle the cords and cable.
b. Adjust cables until xture is level and cord loses its slack but is not taut.
c. Restore power to Outlet Box.
IMPORTANT:
Be sure to install all
M2 Set Screws to secure
the Arms to the Hubs,
as shown on page 5.
Fig. 21
Arm Key
C1
Hub Key
H5
PWR
10½" (5)
1x