Manual

4
SignalLED User Handbook
2
INSTALLATION
INSTALLATION
Installation
Mounting The Sign
Route the signal and power supply cables before nalising the mounting of the sign. These
cables can be routed either through the aperture, or through the cable cut-outs in the back
of the wall mount moulding.
The LED sign should be mounted on a rm solid surface. The sign is supplied with a
NPVOUJOHLJUDPNQSJTJOHYXBMMQMVHTBOEYMBSHFøBOHFTDSFXT
Note: You’ll need the following tools to mount the sign: an electric drill tted with a 6mm
diameter masonry drill bit, a No.1 Pozi-drive screwdriver and a spirit level.
- Drill 2 holes, approximately 34mm deep, using a 6mm diameter masonry drill at the
pitch shown on the drawings.
 *OTFSUUIFXBMMQMVHTøVTIXJUIUIFTVSGBDF
- Use a spirit level on the aluminium tube section to set the sign level before fully
tightening.
The screws can also be used for xing into wood. For correct tting drill a small pilot hole
into the wood before tting the screw.
Opening The End Covers
To get access to the sign mounting points, the side covers need to be opened. Use a
No.1 Pozi-drive screwdriver to unscrew the side cover and gently slide the cover forward
approximately 8mm until it reaches the stops. Pivot open the cover. Please note: do not to
use excessive force when opening the cover.
LD-20F1 & LD-40F1 Flush Sign Mounting Requirements
5IJTTJHOJTUPCFNPVOUFEøVTIUPBXBMM.JOJNVNDMFBSBODFTGSPNUIFTJHOUPBOBEKBDFOU
wall or ceiling are shown below.
Fig 2-1: LD-20F1 & LD-40F1 Flush Sign Mounting Requirements
An absolute minimum of 60mm is required for the opened end cap, a right angled
screwdriver would be needed to screw (unscrew) the end cap retaining screw.
30mm minimum clearance between
ceiling and mounting hole
Minimum clearance
to an adjacent
wall using 2 small
No. 1 Pozi-drive
screwdriver.
Wall Ceiling
30mm
200mm
LD-40F1 520 mm
LD-20F1 316 mm
= Mounting hole