User Manual

2
Figure 1: Marking and Pre-Drilling
INSTALLATION
Use this bracket only with the Sonance PS-S210SUBT
subwoofer (PN 40192) sold separately.
1. Mark and pre-drill mounting points in at least four
locations (six locations recommended as shown).
See figure 1.
2. Secure the bracket to the installation surface. Use
high-quality, graded lag bolts or similar fasteners
rated for > 150 lbs (180kg) each of shear working
load. M10 or 3/8” bolts are recommended. To
prevent excessive vibration transference, use a
damping material (such as mass-loaded vinyl,
neoprene foam, rubber sheets, etc.) between the
bracket and installation surface (see figure 2).
Figure 2: Securing the Bracket
3. With the help of an assistant, lift the subwoofer into
place. The sub can be installed in two orientations
(see figure 3).
Figure 3: Placing the Subwoofer into the Bracket
ORIENTATION 1
ORIENTATION 2