Insert screws (3) into the ceiling bracket (2). Slide the ceiling bracket
with inserted screws onto the rear end of the rail. The switch trigger
located at the rear end of the rail.
Slide the control housing onto the rear end of the rail as far as it will go,
in doing so, positioning the contact springs of the trolley. Ensure that
the chain xing bolts of the control housing are on the same side as the
chain case in the rail.
CAUTION!
The cable guide must be on the bottom of the control
housing.
6
BACK
HINTEN
1
2
3
Use the chain connecting link (3) to connect the chain (1) with the chain
xing bolts of the control housing (2).
7
a
c
90°
b
1
2
3
4
5
6
FRONT
VORNE
FRONT
VORNE
a) Fit the tensioning element (1) into the chain (2)
b) Turn the tensioning element 90°.
c) Slide the plug-in unit (6) onto the rail and push the tensioning
element through it. Position the washer (5) and spring (4) on the
tensioning screw (3) and screw it into the tensioning element.
8 9
1
2
4
3
FRONT
VORNE
FRONT
VORN
E
10 mm
17 mm
17 mm
Tighten the chain as far as the mark (arrow).
Use screw (1) and nut (3) to x the two camber brackets (2) to the plug-
in unit (4), but do not yet tighten fully.
BACK
HINTEN
10
1
2
3
4
Use nut (4) and toothed lock washer (3) to t the two steel brackets (1)
to the ceiling bracket (2).