Installation Instructions

25
46900V001_Rev-D_EN
clic”
clic”
Fig. 2
2. Remove the two connecting sleeves beside the
motor carriage and attach to the track on the left
and right.
Fig. 3
3. Attach a track to each of the connecting sleeves.
Fig. 4
4. Plug in the ceiling control unit to the track behind the
guide idler.
Lay the chain over the guide idler.
90°
90°
Fig. 5
5. Rotate the chain 90° and insert it into the chain
holder of the ceiling control unit.
Rotate the chain back 90°.
Fig. 6
6. Plug the plug-in unit onto the opposite side of the
track.
90°
90°
Fig. 7
NOTE
The chain must be parallel to the track to
prevent damage to the operator.
7. Rotate the chain 90° and insert it into the chain
holder of the plug-in unit.
Rotate the chain back 90°.
6. Installation