User's Manual Part 2

124 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
R
racks
component locations, 6061
connector locations, 7980, 83
design for seismic zones, 22
dimensions, 18
fastener torque values, 20
grounding, 5556
requirements for, 27, 28
installing, 48
filler shelves, 63
positioning and aligning, 50
preparing location, 49
radio shelves, 62
RFSS modules, 66
securing, 5152
utility shelves, 64
PDP circuit breaker loading, 25
unpacking, 40
weight, 19
radio bays. See radio rack
radio rack, 60
connector locations, 79
covering empty bays, 63
installing
radio shelves,
62
utility shelves, 64
weight, 19
See also racks
radio sector controllers
configuring,
45–??
location,
71
radio shelves
attaching to radio rack,
62
cards, 7172
inserting, 75
circuit breakers, 74, 102
location in radio rack, 60
weight, 19
return loss,
97
RF
equipment
measuring VSWR,
9798
reflected energy, 97
RF cables, 88
connecting, 89
RF rack, 61
connector locations, 7980
inserting RFSS modules into, 66
weight, 19
See also racks
RFSS filler panels. See filler panels
RFSS modules, 88
antenna configuration,
95
circuit breakers, 103
connecting antennas to, 9496
inserting into RF rack, 66
location in RF rack, 61
powering on, 102, 103
weight, 19
RFSS signal cables. See signal cables
RFSS slots. See filler panels
routers,
29
S
safety equipment, 38
screws
size and torque value, 20
sector controllers
configuring, ??–
46
securing racks. See racks
security,
30
settings
configuration switch
controller card, 45
Ethernet switch, 108
jumpers, 43
GPS clock module, 105
signal cables,
83
connecting, 84
site requirements
AC outlets,
30
access, 30
antenna locations, 31
building ground, 31
fire protection, 30
for cables, 31
for equipment room and unloading area, 30
for mounting base stations, 30
lighting, 30
software
for performing NPM maintenance,
39
space requirements, 18
spectrum analyzer, 39
static electricity. See electrostatic discharges
Sunset OCx, 39
supplies. See checklists
switch settings
controller card, 45
Ethernet switch,
43
See also Ethernet switches
T
temperature requirements, 21
testing
cable integrity and type, 39
power supplies,
74
recommended equipment, 39
VSWR, 97
tools. See equipment
torque values,
20
U
unpacking equipment. See equipment
utility bus controllers
configuring,
4546