User's Manual Part 2

122 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
circuit breakers, 53, 102
in radio and utility shelves, 74, 102
in RFSS modules, 103
maximum loading in PDP, 25
clock module. See GPS clock module
CompactPCI cards. See cards
CompactPCI power supplies. See power supplies
components
electrostatic damage prevention, 37
location in racks, 6061
powering off,
25
powering on, 102, 103
weight, 19
compression lugs, 55
configuring
controller cards, 4546
Ethernet switches, 43
customizing settings, 108
connecting cables, 78
Ethernet, 86
for grounding racks, 5556
GPS clock module, 87
PDP power, 5758, 8082
RF, 89
RFSS signal, 84
to alarm cards, 85
connections
edge router to base station,
29
Ethernet switch serial cable, 107
for main power source,
23
connectors
maximum torque for,
98
power supply, 7980
RF, 88
RFSS signal,
83
size and torque values, 20
See also connecting cables
cooling system
airflow,
22
location in radio rack, 60
powering on,
102
weight, 19
covering
empty radio bays,
63
unused cards slots, 77
unused RFSS slots, 67
D
digital multimeter, 39
dimensions
base station, 18
rack,
18
distance-to-fault. See DTF
diversity antenna,
31
installing, 9496
RFSS configuration, 95
DTF, 99
E
edge routers, 29
electrical requirements
for grounding racks,
27, 28
power supplies, 23
electrostatic discharges, 37
from card components, 75
from power supplies, 73
Ensure, 57
environmental requirements
airflow,
22
altitude, 21
humidity, 21
in seismic zones, 22
temperature, 21
equipment
checking inventory,
41
for installation, 38
for safety, 38
for testing functionality, 39
reporting damaged parts, 76
unpacking, 40
Ethernet cables, 86
connecting, 86
Ethernet switches
configuring,
43, 107
connecting, 86
jumper configuration, 44
jumper settings, 43
location, 69
parameter settings, 108
serial cable connections, 107
expansion bolts. See anchor bolts
F
fans. See cooling system
fasteners
size and torque values, 20
filler panels
location in rack,
61
to cover empty card slots, 77
to cover empty RFSS slots, 67
G
gateways
PSTN,
29
global positioning system clock. See GPS clock module
GPS antennas,
87
assembly, 92
installing,
92
GPS clock module
antennas. See GPS antennas
cable delay, 105
connecting cables, 87
installing, 65
location in radio rack, 60
optimizing operation of, ??–
105
parameter settings, 105