User's Manual Part 2

110 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
Post-Installation Activities
After the installation of the base station is complete, the base station needs to be provisioned in order
to make the base station fully functional. See the Macro Base Station Provisioning Procedures for the
following information:
Adding the base station to the network
Installing new software loads
Configuring base station settings