User's Manual Part 2

March 29, 2006 Part ######A revision 00a-DRAFT 103
Chapter 6: On-Site Configuration procedures
If the base station has already been configured in the CM tool software, the base station will
automatically start its call processing and enable the air interface. Any SOMAports powered on within the
supported sectors will acquire the base station and establish a connection.
If the base station has not been configured in the CM tool software, the red error lights on the PDPs and
the RFSS modules will light up. The base station will not enable the air interface.
RFSS Module Circuit Breaker
RF shelf 0, RFSS module 0 RF rack PDP, CB 02
RF shelf 0, RFSS module 1 RF rack PDP, CB 03
RF shelf 0, RFSS module 2 RF rack PDP, CB 04
RF shelf 0, RFSS module 3 RF rack PDP, CB 05
RF shelf 1, RFSS module 0 RF rack PDP, CB 06
RF shelf 1, RFSS module 1 RF rack PDP, CB 07
RF shelf 1, RFSS module 2 RF rack PDP, CB 08
RF shelf 1, RFSS module 3 RF rack PDP, CB 09
RF shelf 2, RFSS module 0 RF rack PDP, CB 10
RF shelf 2, RFSS module 1 RF rack PDP, CB 11
RF shelf 2, RFSS module 2 RF rack PDP, CB 12
RF shelf 2, RFSS module 3 RF rack PDP, CB 13
Table 6.2
RFSS Module Circuit Breaker Summary