User's Manual Part 1

52 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
ix Tighten the four anchor bolts in the base of each rack by turning the 3/4-inch washer nut while
holding the 1/4-inch anchor bolt in place. The expansion sleeve is forced open, which secures the
rack to the floor.
x Reattach the lower cooling units to each frame using the 5/16-inch screws. Torque the screws to 50
inch-pounds.
xi Reattach the front grill to each frame using the grill’s two half-turn screws. The screws are vertical
when open and horizontal when locked.