User's Manual Part 1
48 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
I
NSTALLING THE
R
ACKS
These procedures describe how to prepare the floor for rack installation, move the racks into place,
and secure the racks to each other, to the floor, and to the ceiling.
NOTE: When you install the racks, finish positioning and leveling the first rack
before proceeding to the second rack. This makes leveling the racks easier and
minimizes the potential for errors that may occur during rack placement.
The racks are suitable for mounting on concrete or other non-combustible surfaces
only.
Procedure Page
Prepare the Location 49
Position the Racks 50
Secure the Racks 51