User's Manual Part 1

38 Part ######A revision 00a-DRAFT March 29, 2006
Macro Base Station Installation Procedures (NPM-1000)
Equipment, Tools, and Supplies Checklists
Tools
The following tools are recommended for a typical base station installation:
NOTE: Ensure that your torque wrenches are correctly calibrated according to the
methods and schedule specified by the manufacturer. The calibration date should be
indicated on each wrench.
Safety Equipment
The following safety equipment is recommended for a typical base station installation.
Allen key set Platform stepladder (6-foot)
Bolt cutter Plumb bob
Cable ties Portable bandsaw kit
Chalk line Scissors
Drill bits (metal and masonry) Scratch awl
Electrical tape Shims (for leveling racks)
Extension cord Socket sets (Imperial and metric)
Flat file Strap (with buckle)
Framing square Tape measures (linen and metal)
Hacksaw (with blades) Thomas and Betts (T&B) crimper
Hammer drill Torpedo level
Heat gun (with heat shrink roll) Torque wrenches
Label maker Utility knife
Marking pencil Wrench sets (Imperial and metric)
Oxide-inhibiting compound Vacuum cleaner with high-efficiency particulate air
(HEPA) filter
Ear plugs Flashlight
Electrical gloves Portable eye-wash station
ESD straps Safety glasses
First aid kit Safety shoes