User Manual
December 16, 2002 Part 003609A revision 01 69
Chapter 4: Installation Procedures
If any if the tests failed, investigate and correct the problem. Repeat this procedure
after corrective action is taken. Do not power on the NPM if any of the tests failed.
10 Disconnect both probes from the power cable.
11 Power off CB 11 on the radio rack by setting it to the OFF (down) position.
12 Reconnect the power cable to the PS0 connector on the utility shelf.
13 Reinstall the three fuses in the PDP in the radio rack by using a 1/4-inch flathead
screwdriver.