User Manual

48 Part 003609A revision 01 December 16, 2002
Amosphere NPM Installation Procedures (WCS)
To configure the Ethernet switches
1 Remove the two Ethernet switches from their antistatic packaging at a grounded
work area. Ensure that you are properly grounded with a wrist or boot strap before
handling the cards.
2 Remove the K1 PCI Reset jumper from each card. Figure 3.2 shows the location
of the jumper.
Figure 3.2
Ethernet Switch Jumper Configuration
3 Hang the jumper off the header pins as shown in Table 3.5. This ensures that the
jumper is still present if future changes to the cards are required.
4 Ensure that jumpers K2 to K7 are configured as shown in Table 3.5.
5 Place the cards back in their antistatic packaging until you are ready to install them
in the shelves.
00275
K1 PCI Reset Jumper
K7 CPCI BDSEL