User Manual

34 Part 003609A revision 01 December 16, 2002
Amosphere NPM Installation Procedures (WCS)
Site Requirements
Each site has unique requirements and characteristics. See your E1 package for
specific requirements relating to your installation. The E1 package contains the
site’s floor plan, cabling routing and termination, and other site-specific
Restricted Access
Access to the site must be controlled by the authority for that location and
granted through the use of special tools, locks and keys, or other means of
security. Access should be limited to service personnel who have been instructed
about the reasons for the access restrictions and about any precautions that must
be taken while at the location.
Mounting Surface
The NPM is suitable for mounting on concrete or other noncombustible surfaces
only.
Equipment Entrance and Unloading Area
A route must be provided between the unloading area and the equipment room
where no restrictions will be encountered with a clearance less than 0.9 m (36
inches) wide (side-to-side), and 2.0 m (80 inches) high (floor-to-obstruction).
All turns along the route must allow sufficient clearance to turn or tilt an object
0.6 m (24 inches) wide, 0.6 m (24 inches) deep, and 2.1 m (83 inches) high.
AC Outlets
The site must have at least two duplex AC receptacles located within a
convenient distance to facilitate installation and maintenance of the NPM.