User Manual
August 6, 2003 Part 004071A revision 00b 45
Chapter 3: Pre-Installation Activities
Review Site Deliverables List
Table 3.3 shows the paperwork that ships with each NPM basestation.
To check the NPM inventory
1 Perform an inventory check using the site deliverables list provided with the E1
package and BOMs.
2 Ensure that all equipment and accessories have been shipped.
3 Document any shortages and report them to the field support coordinator so that
any missing equipment may be procured and delivered to the site as soon as
possible.
4 Ensure that the serial number for each piece of equipment is recorded in the
basestation’s on-site documentation.
Document Description
Anchor kit Lists installation kit contents
NPM BOM Lists every component in the basestation
Shelf inspection checklist Factory inspection of each utility and radio shelf
Table 3.3
NPM Inventory Documents
installation.book Page 45 Wednesday, August 6, 2003 6:06 PM