Unpack the Equipment
The NPM racks are delivered on shipping pallets. Each rack is secured in an
upright position and is bolted to the pallet. Additional equipment is delivered in
separate shipping boxes.
To unpack the NPM equipment
1 Transport the shipping boxes to the installation area using a dolly or pallet jack.
2 Inspect the exterior packaging for any noticeable damage that may have occurred
during shipment.
3 Verify that the shipment is complete by checking the contents of each box against
the bill of materials (BOM) or shipping invoice that arrives with each box. The BOM
for each box may be located on the outside or inside of the box.
4 Report any missing or damaged components to the field support coordinator as
soon as possible.
5 Cut the packaging tape on each box using scissors or a utility knife.
6 Remove the cardboard packaging from the racks:
i Remove the top of the cardboard packaging.
ii Remove the cardboard sides. The cardboard sides are bolted to the shipping
pallet and pull off with minimal effort.
7 Remove the protective bags covering the racks.
8 Check the racks for extra mounting hardware or invoices. If there are additional
items, remove them and keep them for future use.
9 Remove the four 9/16-inch bolts that secure the base of each rack to its shipping
pallet.
10 Verify the contents of the other boxes by examining their BOMs.
NOTE: Do not remove any items from their antistatic bags until
you are ready to install them.
11 Save the packaging material and the BOMs in case any of the equipment needs to
be returned or moved in the future.