User Manual

August 6, 2003 Part 004071A revision 00b 51
Chapter 4: Installation Procedures
I
NSTALLING
THE
NPM R
ACKS
These procedures describe how to prepare the floor for rack installation, move
the racks into place, and secure the racks to each other, to the floor, and to the
ceiling.
Table 4.1 shows the actions described in this section.
NOTE: When you install the NPM racks, finish positioning and
leveling the first rack before proceeding to the second rack. This
makes leveling the racks easier and minimizes the potential for
errors that may occur during rack placement.
The racks are suitable for mounting on concrete or other
non-combustible surfaces only.
Action Page
Prepare the Installation Location 52
Position the Racks 54
Secure the Racks 55
Table 4.1
Installing the NPM Racks Procedure Summary
installation.book Page 51 Wednesday, August 6, 2003 6:06 PM