User Manual
August 6, 2003 Part 004071A revision 00b 141
: Discontinued NPM Equipment
To configure the application hosts
1 Remove the application hosts from their antistatic packaging at a grounded work
area. Ensure that you are properly grounded with a wrist or boot strap before
handling the cards. Depending on the configuration of your basestation, you may
have up to eight application hosts that need to be configured.
2 On each card, set SW3-3, SW3-4, and SW2-4 to the closed (ON) position. Figure
C.1 shows the locations of the switches.
Figure C.2
Application Host Switch Configuration
3 Ensure that the other switches are configured as shown in Table C.2.
4 Place the cards back in their antistatic packaging until you are ready to install them
in the shelves.
00327
Closed (ON)
Open (OFF)
SW3
Closed (ON)
Open (OFF)
SW2
Closed (ON)
Open (OFF)
SW4
installation.book Page 141 Wednesday, August 6, 2003 6:06 PM