User Manual

August 6, 2003 Part 004071A revision 00b 139
: Discontinued NPM Equipment
To configure the ZT5550 cards
1 Remove cards from their antistatic packaging at a grounded work area. Ensure
that you are properly grounded with a wrist or boot strap before handling the
cards. Depending on the configuration of your basestation, you may have up to
eight cards that need to be configured.
2 On each card, set the SW6-1 switch to the closed (ON) position. Figure C.1 shows
the location of the switch.
Figure C.1
Controller Card Switch Configuration
3 Ensure that the other switches are configured as shown in Table C.1.
4 Place the cards back in their antistatic packaging until you are ready to install them
in the shelves.
00326
Closed (ON)
Open (OFF)
E
N
E
T
B
E
N
E
T
A
A
B
1
0
0
M
b
U
S
B
V
G
A
R
U
N
S
M
ID
E
U
S
R
1
A
L
A
R
M
C
U
T
O
F
F
M
I
N
M
A
J
C
R
T
A
C
O
T
A
K
E
P
W
R
U
S
R
2
R
E
S
E
T
C
O
M
1
SW6
installation.book Page 139 Wednesday, August 6, 2003 6:06 PM