Installation Manual
Table Of Contents
August 23, 2006 Revision 00b-DRAFT 23
Chapter 3: Pre-Installation Requirements and Procedures
Unpack and Inspect the Equipment
Once you received your base station equipment, use the following procedure to ensure you have all the
necessary parts.
To unpack and inspect the base station equipment
1 Transport the shipping boxes to the installation area using a dolly or pallet jack.
2 Inspect the exterior packaging for any noticeable damage that may have occurred during shipment.
3 Unpack the equipment. If a component is packed in anti-static packaging, leave the component inside
the packaging until you are ready to install it.
4 Check the equipment for extra mounting hardware or invoices. If there are additional items, remove them
and keep them for future use.
5 Save the packaging material and the BOMs in case any of the equipment needs to be returned or moved
in the future.
6 Ensure that all equipment and accessories have been shipped.
7 Document any shortages and report them to your SOMA Networks representative so that any missing
equipment may be procured and delivered to the site as soon as possible.
8