Installation Manual
Table Of Contents
16 Revision 00b-DRAFT August 23, 2006
Macro Base Station Installation Procedures (NPM-2500)
General Site Requirements
Each site has unique requirements and characteristics. Consult your SOMA Networks technical
representative for information about specific site requirements. See the Network Deployment Planning
Guide for a comprehensive description of generic site requirements.
Restricted Access
The base station is intended for installation in restricted access locations only. Access to the site must
be controlled by the authority for that location and granted through the use of special tools, locks and
keys, or other means of security. Access should be limited to service personnel who have been
instructed about the reasons for the access restrictions and about any precautions that must be taken
while at the location.
Mounting Surface
The base station equipment is intended for installation only in areas with concrete or other
noncombustible surfaces.
Equipment Entrance and Unloading Area
A route must be provided between the unloading area and the equipment room where no restrictions
will be encountered.
AC Outlets
The site must have at least two duplex AC receptacles located within a convenient distance to facilitate
installation and maintenance of the base station.
Fire Protection System
SOMA Networks recommends a fire protection system for the site.
Lighting
The site must have sufficient lighting to conduct work in a safe manner. Emergency lighting is
recommended. Lighting must meet local and other applicable regulations.
Beacon System
Depending on its height and applicable regulations, the tower may require aviation safety lights.
Consult the aviation, environmental, and communication regulations applicable to your site for
information.